04.26.08
Preping Chassis
![]()
![]()
![]()
I started preparing the Chassis for sand blasting and powder coating. I needed to strip it down completely. I figured this was would take me 4 days. Boy was I wrong. I started at 0730 and finished removing front and rear suspension, pedals, all grommets, all rubber tubing and all bearings by 1400. This chassis is a dream to work on.
I highly recommend the Bently Bug Book. It has been invaluable.